Lockout/tagout the disconnect and verify zero voltage L1-L2-L3 to ground before touching leads. Bleed all stored air pressure before pulling belt guards or couplings. Discharge megger-tested windings through a grounding stick — capacitive energy in a large winding can put you on the floor.

1. Visual + mechanical first pass
  • Nameplate: FLA, service factor, insulation class (B/F/H), frame, RPM, voltage code.
  • Smell test — burnt varnish = thermal failure; expect a failed megger downstream.
  • Check the peckerhead for oil ingress, melted lugs, loose crimps, and rodent damage.
  • Vents and shroud clear? A blocked TEFC fan cooks a motor at full load in hours.
  • Spin the shaft — rough, gritty, or sticky = bearings, regardless of electrical tests.
2. Winding resistance (DLRO / ohmmeter)

Isolate the six leads. Measure phase-to-phase: T1↔T2, T2↔T3, T1↔T3. On a balanced motor all three readings agree within ±5%. Use a 4-wire DLRO on motors larger than 50 HP — typical phase resistance falls below 0.1 Ω and a standard meter cannot resolve it.

Interpreting the result
  • One phase ~50% higher → likely open coil or bad internal connection.
  • One phase lower than the other two → shorted turns; surge test to confirm.
  • All three high → corroded splices in the peckerhead, not the winding itself.
3. Insulation resistance (megger) + Polarization Index

Disconnect all leads from the contactor. Use 500 V DC for 240 V class motors and 1000 V DC for 480/600 V class. Megger each phase to ground for 60 seconds; record IR60.

IEEE 43 minimum (Class F, 40°C)≥100 MΩ
Acceptable for return-to-service≥10 MΩ per kV + 1
Marginal — investigate1–10 MΩ
Fail — do not energize<1 MΩ

For motors ≥100 HP, run a 10-minute test and compute the Polarization Index = IR10 / IR1. PI ≥ 2.0 is good insulation; 1.0–2.0 is dirty or moist (bake the winding at 90°C for 8–12 h and retest); PI < 1.0 is wet or carbonized — send for rewind.

Temperature-correct readings to 40°C: IR roughly halves for every 10°C rise. A 75°C motor reading 20 MΩ is actually around 220 MΩ at 40°C.

4. Surge / hipot when megger passes but motor still fails

A megger only finds insulation breakdown to ground. Turn-to-turn shorts inside the same coil pass DC tests cleanly, then fail on AC voltage stress as soon as the motor starts. If you have a motor that meggers good but trips its overload within seconds of running, send it to a shop for a surge comparison test before chasing the controls.

5. Bearing diagnostics
  • Decouple from the load and run uncoupled for 15 minutes.
  • Bearing housing temperature >85°C unloaded = replace.
  • Vibration pen reading above 0.15 in/s RMS on the bearing cap = degraded.
  • Audible growl, ticking, or harmonics through a stethoscope = replace.
  • On VFD-driven motors, inspect the non-drive bearing race for fluting (washboard pattern from shaft currents). Replace with an insulated or ceramic-hybrid bearing and add a shaft grounding ring.
6. Rewind or replace?
≤10 HP, standard NEMA frameReplace — new premium-efficient unit
15–50 HP, NEMA PremiumRewind if cost <65% of new
50–200 HPRewind; verify shop has VPI dip-and-bake capability
Non-standard frame / OEM-specificRewind — replacement lead time often weeks
2-pole (3600 rpm) older standard-efficientReplace — efficiency gap pays back fast
7. Commissioning checklist
  • Bump test for correct rotation before coupling to the airend or flywheel.
  • Set overload heaters to nameplate FLA × SF, or FLA × 0.58 for wye-delta line legs.
  • Record no-load amps on all three phases — should be balanced within 10%.
  • Record full-load amps, voltage on all three legs, and frame temperature at 1 hour.
  • Re-megger after the first 100 hours and file results in the unit's PM record.