Holds roughly 65 – 75 PSIG in the sump so oil circulates and the separator element is protected, and acts as a check back from the plant air system.

Also called: MPV · minimum pressure check valve · MPCV

De-energised state: NC

Normally closed — cracks open at the spring setting, typically 4.5 bar / 65 PSIG.

How it works

A spring-loaded poppet downstream of the separator element. It stays closed until sump pressure exceeds the spring setting, guaranteeing minimum oil-circulation pressure and low separator velocity on start-up. Its check function stops the shop air system back-feeding the sump on shutdown.

Specifications

Typical crack pressure
60 – 75 PSIG (4.0 – 5.2 bar)
Body sizes
3/4" – 3" NPT / flanged
Wear items
Poppet seal, spring, O-rings
Service
Rebuild at separator change or on high separator dP

Parts you can order

  • Aftermarket service kit
    Minimum pressure / check valve kit
    Match by valve body number
    $80 – $350
  • OEM assembly
    Minimum pressure valve, complete
    OEM number from parts list
    $350 – $1,400
  • Aftermarket service kit
    Minimum pressure valve rebuild kit
    By body size (3/4, 1, 1-1/2, 2 in.)
    $55 – $260
  • Kaeser (OEM)
    Minimum pressure / check valve kit
    Serial-specific (Kaeser Parts portal)
    $110 – $420
  • Ingersoll Rand (OEM)
    Minimum pressure / check valve assembly
    Serial-specific (IR parts portal)
    $220 – $900
Open the full parts database →

Field test procedure

  1. Cold start and watch the sump gauge: it should reach ~65 PSIG before service-line pressure begins to rise.
  2. Blows back through the intake or the sump won't depressurise at stop = failed check seat.
  3. Compare sump vs line pressure while loaded — more than about 15 PSI difference at full load means a restricted separator or a stuck MPV.

Symptoms & probable causes

  • Separator element ruptured
    MPV stuck open — high velocity through the element on start-up.
  • Sump stays pressurised after stop
    Blowdown blocked, or the MPV check is holding shop pressure back into the sump.
  • High separator dP alarm
    Restricted element, or MPV stuck partly closed.